Product Categories

Applications

News

The usage of Oil Volumetric Doser


A joint hose
Connect the hose with the drums. The color of the oil supply unit (black 220V) is turned on, the signal line (gray) and the injection molding machine signal (24V-220V) connected.
The No. 3 or turn knob adjusted X.1 middle. The 4-bit value is adjusted to 20 or so. The number one key adjusted FORWORD, the No. 2 bond was adjusted to CONTINUOUS, No. 6 rotor starts to rotate. The hose clamp on the rotor, the rotor rotates to ensure the hose will not shift, then the barrel near one end of the control panel.
Second, the continuous oil
Maintained No. 1 and No. 2 position unchanged after oil drums full of color until the pump hose, the number 2 raised to OFF, stop.
Third, correction: the No. 3 turn knob adjusted to CAL, the No. 1 raised FORWORD, No. 2 raised CYCLE. No. 6 rotor starts to rotate, No. 5 show values from 100-0, measurement end. Repeat the process were measured three times.
Weighing measurement three times the total amount of oil pumped out color.
Fourth, began producing the No. 3 turn knob adjusted X.1, the input value A No. 4, No. 1 will be transferred to FORWORD, No. 2 transferred CYCLE. Begin normal production. In each injection cycle, the number 5 is displayed value from A to 0, indicating that the normal color oil metering machines.
Fifth, to stop production: the number 2 raised to OFF, a number adjusted to the middle position. Color oil machine downtime.
Sixth, remove the hose: the number 2 raised to CONTINUOUS, No. 1 raised REVERES, No. 6 rotor reversed, pulling the hose away from the control panel from the direction of the rotor from the hose.